‘Three single-arms drilling rig excavating’ program was affirmed
Home » News & Events » ‘Three single-arms drilling rig excavating’ program was affirmed

Guinan high-speed railway is the first high-speed railroad in Guangxi with a design speed of 350 km/h, the line runs through the northwest of Guangxi and southeast of Guizhou, is an important part of China's "medium and long-term railroad network planning" "eight vertical and eight horizontal" high-speed railroad network package sea channel, for the connection of "The Belt and Road"and promote the construction of new land and sea channels in the west has important significance. By then, the travel time from Nanning to Guiyang will be shortened from the current 5 hours to about 2 hours.

The Yongxing No. 1 Tunnel of the Guinan High-speed Railway is a double-track tunnel. The main tunnel is mostly of IV surrounding rock, which is excavated by the step method, and the auxiliary tunnel flood discharge tunnel is excavated in full section. The mechanized construction of 3 Siton single-arm rock drilling rigs is used to meet the requirements of rock drilling and drilling construction such as excavation of blast holes, advanced support, locking feet, and system bolts. 3 single-arm rock drilling rigs (two DW1-70 + One DW1- 90), all equipped with 18kw high-power rock drills, 5.5 meters drill pipe, divided into 2 shifts according to the main hole and the flood discharge tunnel, the main hole is circulated once a day, and the flood discharge is carried out 2-3 cycles/day, single cycle footage 3.8 meters.

Advantages of using multiple single-arm excavation

1. High utilization rate of equipment: multiple equipment has a clear division of labor and flexible scheduling, which can meet all drilling constructions such as upper and lower passages, blast holes and bolts of flood discharge tunnels.

2. Labors: 6 people for the construction of the main tunnel and 4 people for the construction of the flood discharge tunnel can complete the drilling construction.

3. Safety: The operator should work under the safe cab away from the working surface (especially the construction of anchor rods), and the noise decibel of the three equipment is lower than 80dB.

4. High efficiency and energy saving: It takes only 2 minutes for a single hole of 4 meters to drill, and more than an hour for a single cycle to drill. During operation, a single device is only 62KW, which saves more than 45% energy compared with air compressors.

5. Low investment and high security: the total investment cost of 3 single arms is not higher than that of multi-arms, and if one of multiple single arms fails, it will not cause shutdown.


The construction environment of the construction site was complex, the temperature difference between inside and outside the cave was large, the cold wind outside the cave was biting, and the inside of the cave was abnormally sultry, approaching 37℃. The overwhelming humid air was like a sauna, making people sweat profusely. Master Yang, the after-sales service engineer of Siton, led three classes to overcome the impact of the epidemic, rainy, high and low temperature, actively and efficiently dealt with various construction problems on site, achieving the great achievement of more than 200 meters of progress in the drainage tunnel in one month.

Master Yang said that these days of serving at the tunnel construction site can be said to be full of "ups and downs". In order to solve the unexpected problems in the construction process and not delay the construction progress, their team often forgot the time when they start working, and they didn't complain when their clothes and shoes are soaked. When they were full of fatigue, they just fell asleep in the dormitory without replacing their uniforms with many oil stains.

It is precisely because of this spirit of not being afraid of hardships, being conscientious and selfless, that customers give Siton's after-sales service team a high praise for "excellent technology, comprehensive service, conscientiousness, and great satisfaction".

The after-sales team of Siton was also very moved to receive this honor. This is the great affirmation and encouragement of customers for Siton's after-sales work. Master Yang said he will continue to strictly demand himself with high standards in the future, and lead the after-sales team to serve each customer in a more professional and timely manner.

Welcome to send your message to us
*Email
!!
*Content
!
Product Name
Your Name
Company
Tel/Fax.
WhatsApp
Double Booms Jumbo | Face Drilling Rig | Mucking Roadheader | Rock Loader | Crawler Loader with Hammer | Coal Mucking Loader | Rock Mucking Machine | Tunnel Mucking Machine | Underground Mucking Loader | Dual Power Mucking Loader | Tyre Belt Muck Loader | Side Dump Equipment | Mucking Belt Conveyor | Mining Skip | Underground Loader | Tunnel Loader | Drilling Jumbo | Concrete Sprayer | LWT-150 Wheel Mucking Loader | LWT-120 Wheel Mucking Loader | Hand-hold Rock Drills | Air Picks | Pneumatic Crusher | WJ-1 Diesel LHD Loader | WJ-2E Diesel LHD Loader | WJ-1.5C Diesel LHD Loader | WJ-1.5G Diesel LHD Loader | WJ-2F Diesel LHD Loader | WJ-2G Diesel LHD Loader | XTUW-3 Diesel LHD Loader | XTUW-4 Diesel LHD Loader | XTUW-5 Underground LHD Scooptram | XTUW-6 Underground LHD Scooptram | WJD-0.75 Electric LHD Loader | WJD-1 Electric LHD Loader | WJD-1.5 Electric LHD Loader | WJD-1.5C Electric LHD Loader | WJD-1.5G Electric LHD Loader | WJD-2F Electric LHD Loader | WJD-2G Electric LHD Loader | WJD-3 Electric LHD Loader | UK-4 Underground Truck | UK-6 Underground Truck | UK-10 Underground Truck | XTUT-12 Underground Truck | XTUT-15 Underground Truck | XTUT-20 Underground Truck | XTUT-30 Underground Trucks | DWE1-31N Wheel Single Boom Drilling Jumbo | Big Slope Crawler Mucking Loader | Level Surface Crawler Mucking Loader | Dual Power Crawler Mucking Loader | Special Models Crawler Mucking Loader | Crawler Drilling Jumbo | Mining Production Drilling Rigs | Forward Dumping Wagon | Bottom Dumping Wagon | Bottom Side Dumping Wagon | Fixed Wagon | Mobile Belt Conveyor | Hangling Belt Conveyor

line